- Home
- /
- Manager's Messages
- /
- Sky Window Washing
Sky Window Washing
Posted By kdub on September 29, 2017
Sky – The Sky window washing will begin on Monday, October 2 and will take approximately two weeks to complete.
The work will progress as follows on the side facing:
- the beach
- the main driveway
- Via Dolce
- Washington
- the smaller middle section on both ends
- the 2nd floor balconies